MOLSON COORS DB

LocationLongueil, QC
Area925,000 sq.ft.
Completion2021 (projected)

Molson-Coors will serve the Quebec beer market from this new brewery and distribution center, currently under construction on the South Shore of Montreal. The facility includes a Brewery, power station, Fermentation tank farm, Packaging, and Distribution warehouse.
The D.C. has a clear height of 74’ and large spans to accommodate a fully automated ASRS serving 24 loading doors plus 11 interior loading bays for side-loading trucks. The tank farm rises to a height of 85’, the maximum permitted due to the adjacent airport runway. In addition to the D.C there are multiple other loading doors to serve receiving of different products, waste management etc.
The facility is designed to stringent health and safety standards affecting all architectural details, as well as floor drainage and finishes. There is also a full-height MFL firewall to meet insurance requirements. A structural steel pipe spine is integrated with the building structure to support the myriad pipe distribution required for the process, and all production and warehouse areas are closely coordinated with many different equipment suppliers.