Jerry Coviensky
LEED AP
Emeritus Partner
Harden - Distribution Centre and Offices
Vaudreuil-Dorion, QC
The first building completed at Campus Henry Ford, a seven-lot industrial park in Vaudreuil-Dorion, the project includes a 457,000 sq. ft. distribution centre paired with administrative spaces. Located on Henry-Ford Street, near Highways 20, 30 and 40, it occupies a strategic location for logistics and distribution.
Certified LEED BD+C: New Construction v4 in 2024, it sets the tone for the campus through its construction quality, sustainable approach and architectural integration.
Project team
Jerry Coviensky
LEED AP
Emeritus Partner
Alper Caglar
OAQ, OAA, AIBC
Associate, Project Director
Katherine Markakis
Technical Director
The facility features a spacious 45'-6"-high warehouse alongside a 33'-0" administrative volume with a mezzanine. Facing the access road, the extensively glazed offices create a transparent, welcoming frontage at the main entrance.
The site layout thoughtfully separates circulation flows: car parking is organized in the front yard and bordered by landscaped strips, while truck courts are positioned along the building’s sides with dedicated access points. The office volume and a screen wall help conceal logistics operations from the site entrance, enhancing the campus’s visual appeal.
Vertical metal panels in three dark tones create a subtle gradient across the façades. Their irregular arrangement introduces movement, while glazed openings punctuate the long elevations and visually break down the scale of the warehouse.
The administrative volume has a lighter expression. Its glazed façade extends along the service road and contrasts with the metal envelope of the distribution centre, distinguishing the building’s different functions within a cohesive composition.
The building's environmental performance is supported by a series of measures incorporated into the building and its site. LED lighting, occupancy sensors and control systems adjust energy use to the needs of each space, while energy recovery systems contribute to overall efficiency.
Low-flow plumbing fixtures and landscaping designed to minimize irrigation needs help reduce water consumption. A highly reflective white roof also helps mitigate the heat island effect.
Electric vehicle charging stations and systems for monitoring energy consumption complement these measures, along with strategies related to material selection and construction waste management.
Running parallel to Highway 30, the rear façade receives the same architectural attention as the main frontage. Dark metal panels, framed by a broad white border, heighten the contrast and give the elevation a bold, graphic quality.
The white frame continues onto the side façades, creating visual continuity around the building. Vertical openings punctuate these elevations, breaking up their length. The result is a carefully articulated structure on all sides, whether viewed from the campus entrance or the highway.
As the first completed project at Campus Henry Ford, the building helps establish an identity for the new industrial park. Its functional organization, sustainable strategies and carefully articulated envelope balance the requirements of a large-scale distribution centre with a distinctive architectural expression.
Certification
LEED BD+C: New Construction v4
2024
Interior Design: An Evolving Team
View more
Beware of Fraudulent Job Offers
View more
Courtney Posel Named Associate at GKC
View more